The verti-drain was used at the Happy Valley turf track for the full width of the A course from 23 to 24 December 2021 to alleviate surface compaction.
On completion of the works, the areas were lightly rolled as per previous practice.
The verti-drain was used at the Happy Valley turf track for the full width of the A course from 23 to 24 December 2021 to alleviate surface compaction.
On completion of the works, the areas were lightly rolled as per previous practice.