The verti-drain was used on the Sha Tin turf track to alleviate surface hardness according to the following schedules:
               
			
			
	The verti-drain was used on the Sha Tin turf track to alleviate surface hardness according to the following schedules:
| 26 Mar – 9 Apr | A to C Course | 
| 22 – 23 Apr | C+3 Course and the remaining area | 
On completion of the works, the areas were lightly rolled as per previous practice.