The verti-drain was used on the Sha Tin turf track for the full width of the B+2 course from 31 March to 1 April 2026 to alleviate surface compaction.
On completion of the works, the areas were lightly rolled as per previous practice.
The verti-drain was used on the Sha Tin turf track for the full width of the B+2 course from 31 March to 1 April 2026 to alleviate surface compaction.
On completion of the works, the areas were lightly rolled as per previous practice.