The large all weather track was ripped today to a depth of 5 1/2″ to alleviate surface compaction and to achieve thorough mixing of 140 cubic metre of fine bark chip applied on Thursday 17 October 2024 and 36 tonnes of silt and clay applied today.
The large all weather track was ripped today to a depth of 5 1/2″ to alleviate surface compaction and to achieve thorough mixing of 140 cubic metre of fine bark chip applied on Thursday 17 October 2024 and 36 tonnes of silt and clay applied today.