The verti-drain was used on the Sha Tin turf track to alleviate surface hardness according to the following schedules:
The verti-drain was used on the Sha Tin turf track to alleviate surface hardness according to the following schedules:
2-9 Sep | A to C course |
16-17 Sep | C + 3 course and the remaining area |
On completion of the works, the areas were lightly rolled as per previous practice.