1. Verti-drain and coring on Sha Tin turf track
The verti-drain and the corer were used on the Sha Tin turf track to alleviate surface hardness according to the following schedules:
22 Jan – 5 Feb | A to C Course |
11 – 13 Feb | C Course and the remaining area |
On completion of the works, the areas were lightly rolled as per previous practice.
2. Ripping of large all weather track
The large all weather track was ripped today to a depth of 5 1/2″ to relieve surface hardness.