1. Verti-drain on Sha Tin turf track
The verti-drain was used on the Sha Tin turf track to alleviate surface hardness according to the following schedules:
2 – 8 January | A to C Course |
14 – 16 January | C+3 Course and the remaining area |
On completion of the works, the areas were lightly rolled as per previous practice.
2. Ripping of large all weather track
The large all weather track was ripped today to a depth of 5 1/2″ to relieve surface hardness as well as to achieve thorough mixing of 36 tonnes of silt and clay applied on 15 January.